Wharf Road Multi Storey Car Park Remedial Works
- Subscribe to updates
- Share this item
Meeting: 08/07/2025 - Cabinet (Item 16)
16 Wharf Road Multi-Storey Car Park Grantham Phase 1 Maintenance Works
PDF 279 KB
To obtain authority to enter in to a contract
of works for remedial works at Wharf Road Multi Storey Car Park in
Grantham
Additional documents:
- Appendix 1 - Wharf Road Car Park Procurement Summary Report, item 16
PDF 250 KB
- Webcast for Wharf Road Multi-Storey Car Park Grantham Phase 1 Maintenance Works
Minutes:
Purpose of report
To obtain authority to enter into a contract for essential maintenance works at Wharf Road Multi-Storey Car Park Grantham.
Decision
That Cabinet approves the award of a contract to Rio Asphalt & Paving Co Ltd for a value of £283,305.14 +VAT for essential maintenance works at Wharf Road Multi-Storey Car Park Grantham.
Alternative options considered and rejected
Delaying the works further would mean the car park surface and underlying concrete framed structure would further deteriorate leading to much higher costs in the future. Therefore, this option was discounted.
Reasons for the decision
- The structure of the car park was deteriorating as evidenced by corrosion of the concrete plank structural fixings below Level 3. Resurfacing with mastic asphalt to Level 3 would prevent water ingress and the existing corrosion would be treated to prevent further deterioration.
- The following points were highlighted during debate:
- The car park at Wharf Road had been subjected to a thorough set of surveys.
- Officers had liaised with the landlord, who had agreed a programme of works. The design of the car park had been undertaken by Pick Everard; various contractors had looked at the surfaces to ensure work would be accurate.
- Consultations had taken place with structural engineers regarding the car park. The scope of works included upgrading of the surface base.
- There was no figure available for any projected loss of income because only part of the car park would be closed during the works. At least two of the parking levels would remain open on most days.
- As the car park was being used more than previously (although still far below capacity) it meant that the work was essential.