Agenda item

Application S20/0384

Proposal:                   Erection of industrial unit (Class B1a, B2 and B8), with associated ancillary offices, service yard and car parking

Location:                    Springfield Road, Grantham, NG31 7SA

Recommendation:   To approve the application subject to conditions

Minutes:

Proposal:     Erection of industrial unit (Class B1a, B2 and B8), with associated ancillary offices, service yard and car parking.

 

Location:      Springfield Road, Grantham, NG31 7SA

 

Decision:      To approve the application subject to conditions

 

Noting comments made during the public speaking session by:

 

Applicant/Applicant’s Agent

George Mander

 

Together with:

 

·         Comments and the request for a second noise impact assessment from SKDC Environmental Protection Services

·         No objection and comments from Lincolnshire County Council Highways and SUDS Support, including an additional condition

·         Comments and a proposed condition from Anglian Water

·         No response received from InvestSK

·         No response received from Grantham Civic Society

·         No letters of representation received as a result of public consultation

·         Provisions within the National Planning Policy Framework and the South Kesteven Local Plan and supplementary planning documents

·         Site visit observations

·         Comments made by members at the meeting

 

During the debate, one Member referred to the Geo-Environmental report undertaken in February 2016 and noted that basic protection measures had been requested in the building design to mitigate any potential contamination from radon. He sought assurance that sufficient consideration had been given to this in the application. The Case Officer confirmed that a ground contamination assessment had been undertaken and no specific conditions had been required as a result of this assessment. However, the Committee requested that an additional condition be included in the planning permission to address this concern. The Case Officer agreed to include a condition relating to contaminated land (condition 6 below).

 

It was proposed, seconded and agreed that the application be approved for the summary of reasons set out in the case officer’s report, subject also to the following conditions:

 

Time Limit for Commencement

 

1        The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.

 

Approved Plans

 

2        The development hereby permitted shall be carried out in accordance with the following list of approved plans:

         

i.              Location Plan 17191 P0001 Rev B (received by the Council on 5th March 2020);

ii.         Site Plan 17191 P0004 Rev H (received by the Council on 26th June 2020);

iii.        Proposed surfacing plan 17191 P0005 Rev F (received by the Council on 5th March 2020);

iv.        Proposed elevations 17191 P0012 Rev D (received by the Council on 5th March 2020); and

v.         Proposed warehouse plan 17191 P0008 Rev E (received by the Council on 5th March 2020)

vi.        Proposed ground floor and first floor office plan 17191 P0009 Rev D (received by the Council on the 5th March 2020)

vii.       Proposed roof plan 171914 P0010 Rev C (received by the Council on the 5th March 2020)

viii.      Proposed fencing layout 17191 P0006 Rev F (received by the Council on the 5th March 2020)

ix.        Proposed cycle and smoking shelter details 17191 P0007 Rev F (received by the Council on the 5th March 2020)

 

            Unless otherwise required by another condition of this permission.

 

Pre-commencement Conditions

 

CEMP

 

3        No development shall take place until a Construction Management Plan and Method Statement has been submitted to and approved in writing by the Local Planning Authority which shall indicate measures to mitigate against traffic generation and drainage of the site during the construction stage of the proposed development.

 

The Construction Management Plan and Method Statement shall include:

 

o   the parking of vehicles of site operatives and visitors;

o   loading and unloading of plant and materials;

o   storage of plant and materials used in constructing the development;

o   wheel washing facilities;

o   hours of construction works;

o   strategy stating how surface water run off on and from the development will be managed during construction and protection measures for any sustainable drainage features.

 

The Construction Management Plan and Method Statement shall be strictly adhered to throughout the construction period.

 

During Building Works

 

Landscaping details

 

4        Before any construction work above ground is commenced, details of hard and soft landscaping works shall have been submitted to and approved in writing by the Local Planning Authority. The landscaping details shall be in general accordance with those set out on Proposed Site Plan 17191 P0004 Rev H and in the Design and Access Statement.

 

o        Details shall include:

 

i.          planting plans;

ii.         written specifications (including cultivation and other operations associated with plant and grass establishment);

iii.        schedules of plants, noting species, plant sizes and proposed numbers/densities where appropriate;

 

Materials

 

5        Before any part of the development hereby permitted is occupied/brought into use, the external elevations shall have been completed using only the materials stated in the planning application forms and approved plans unless otherwise agreed in writing by the Local Planning Authority. 

 

Contaminated land

 

6       Before any part of the development hereby permitted is occupied/brought into use, the building shall have been built in accordance with recommendations of the submitted Geo-Environmental Report (Delta Simons, February 2016) including with regards to basic radon protection measures to be incorporated into the building design.

         

Before the development is occupied

 

Landscaping implementation

 

7        Before the end of the first planting/seeding season following the occupation of any part of the development hereby permitted, all soft landscape works shall have been carried out in accordance with the approved soft landscaping details.

 

Drainage

 

8        Before any part of the development hereby permitted is occupied/brought into use, the works to provide the surface and foul water drainage shall have been completed in accordance with the approved details – Flood Risk Assessment and Drainage Strategy, Pure Structures February 2020.

                          

Access barrier

 

9        Prior to occupation of the development, details of the barrier and intercom on Hanbury Lane shall be submitted to and approved in writing by the Local Planning Authority. The proposed barrier siting shall ensure that no part of the longest vehicle that would routinely visit the site would be standing on, and thereby obstructing, the Public Highway - Hanbury Avenue.

 

Ongoing Conditions

 

Landscaping protection

 

10     Within a period of five years from the first occupation of the final dwelling/unit of the development hereby permitted, any trees or plants provided as part of the approved soft landscaping scheme, that die or become, in the opinion of the Local Planning Authority, seriously damaged or defective, shall be replaced in the first planting season following any such loss with a specimen of the same size and species as was approved in condition above unless otherwise agreed by the Local Planning Authority.

 

Lighting

 

11        Before works to erect the floodlights hereby permitted are commenced, details of the floodlighting including levels of illumination and hours of operation shall have been submitted to and approved in writing by the Local Planning Authority.

Supporting documents: