Agenda item
Application S23/2032
Proposal: Reserved matters application for approval of details relating to layout, scale, appearance and landscaping in connection with outline residential development of up to 71 dwellings, vehicle access, public open space and associated infrastructure S19/1784
Location: Land east of Folkingham Road, Morton
Recommendation: To authorise the Assistant Director – Planning to GRANT planning permission, subject to conditions.
Minutes:
Proposal: Reserved matters application for approval of details relating to layout, scale, appearance and landscaping in connection with outline residential development of up to 71 dwellings, vehicle access, public open space and associated infrastructure S19/1784
Location: Land east of Folkingham Road, Morton
Recommendation: To authorise the Assistant Director – Planning to GRANT planning permission, subject to conditions.
Noting comments in the public speaking session by:
District Ward Councillor Sue Woolley (statement)
For Paul Slater (Balfour Beatty Homes)
Together with:
· Provisions within SKDC Local Plan 2011-2036 and National Planning Policy Framework (NPPF).
· No comments received from Natural England.
· Comments received from LCC Highways & SuDS Support.
· Comments received from Affordable Housing Officer (SKDC).
· Comments received from Heritage Lincolnshire.
· No comments received from Environmental Protection.
· Comments received from Cllr Woolley.
· Comments received from Conservation Officer (SKDC).
· Comments received from Anglian Water.
· Comments received from Morton and Hanthorpe Parish Council.
(Councillor Tim Harrison re-joined the meeting at 14:25)
During questions to Public Speakers, Members commented on:
· Whether the Applicant had any concerns regarding the incursion onto the A15 road. It was queried whether the entry access would be inside the 30mph speed limit or not.
The Applicant confirmed that the 30mph zone would be extended North to ensure the entrance would be within that zone.
· It was queried whether the pond would be able to cope with high amounts of rainfall.
The Applicant’s engineers had assured them that the site had been designed on a 100-year flood risk basis. It was further confirmed that all dwellings proposed would have solar panels.
· What form of heating systems was proposed for the dwellings.
It was clarified that condensing gas boilers would be used for larger properties and combi boilers may be installed into the smaller properties.
The Assistant Director for Planning reminded the Committee that the application was reserved matters and the principle of development had been agreed.
During questions to Officers and debate, Members commented on:
· That the Parish Council had raised concerns of foul water drainage.
The Planning Officer highlighted that foul water drainage had previously been approved in a condition relating to the outline planning permission.
Members were pleased with the access and footpath from the development.
It was queried whether a key view across to the church had been included within the layout of the site.
The Planning Officer confirmed that the development included a central road through the centre of the development, whereby a view of the church would be seen. It was added that the informal space to the north-east to the site would also provide a view of the church.
· Concern was raised on the southern boundary up to the high street and whether there was scope around the inclusion of a safety feature, due to an incline in the footpath.
It was noted that any safety feature would restrict vehicular access that needed to be retained at the site entrance. Highways had stated that a safety feature would not be a requirement for the development access.
It was proposed, seconded and AGREED that a condition be included that a safety feature be included on the path/cycleway prior to first occupation.
It was proposed, seconded and AGREED to authorise the Assistant Director – Planning to GRANT planning permission, subject to conditions:
Approved Plans
1 The development hereby permitted shall be carried out in accordance with the following list of approved plans:
· Site Location Plan, drawing ref. FRM-101-23 (received 02/11/23)
· Planning Layout, drawing ref. 1311-004 Rev D (received 29/04/24)
· Ecology Layout, drawing ref. 1311 BAT Rev C (received 29/04/24)
· Affordable Housing Tenure, drawing ref. 1311-AH Rev C (received 29/04/24)
· Enclosures Plan, drawing ref. 1311-005 Rev D (received 29/04/24)
· EV Charging Points Locations, drawing ref. 1311-EV Rev D (received 29/04/24)
· Housing Mix, drawing ref. 1311-HM Rev D (received 29/04/24)
· Materials Proposals, drawing ref. 1311-006 Rev D (received 29/04/24)
· Soft Landscape Proposals, drawing ref. GL2176 01A (received 06/03/24)
· Soft Landscape Proposals, drawing ref. GL2176 02A (received 06/03/24)
· Soft Landscape Proposals, drawing ref. GL2176 03A (received 06/03/24)
· Private Lighting Layout, drawing ref. 28345_02_100_01 A (received 31/01/24)
· Levels Layout, drawing ref. 1205-00-05 A (received 02/11/23)
· Indicative Streetscenes, drawing ref. FRM002-23 (received 02/11/23)
· Tree Protection Plan, drawing ref. FRM-012-23 (received 23/11/23)
· Vehicle Tracking Plan, drawing ref. 1205-00-02 Rev A (received 06/03/24)
· Drainage Strategy Plan, drawing ref. 1205-00-03 Rev E (received 06/03/24)
· Post and Rail fence Plan, drawing ref. FRM-DET-001 (received 06/03/24)
· Close Boarded Fence Plan, drawing ref. FRM-DET-002 (received 06/03/24)
· Stone and brick Wall Details Plan, drawing ref. FRM-DET-003 (received 06/03/24)
· LEAP Proposals Plan, drawing ref. GL2176 04A (received 06/03/24)
· Tree Pit Details Plan, drawing ref. GL2176 06T (received 06/03/24)
· Surface Water Management Plan, drawing ref. MORT.TW-SW.01 (received 06/03/24)
· Adoptable Highway Construction and kerbing, drawing ref. 1205-02-05 Rev D (received 26/03/24)
· Safety Signage for Attenuation Areas (received 02/11/23)
· Fixed Entrance Gates, drawing ref. 001 (received 02/11/23)
· Fixed Entrance Gates, drawing ref. 002 (received 02/11/23)
· Fixed Entrance Gates, drawing ref. 003 (received 02/11/23)
House Type Information –
· ‘Oak’ Plans and Elevations, drawing ref. PH531.1/3 A (received 29/04/24)
· ‘Oak’ Plans and Elevations, drawing ref. PH531.1/3.1 A (received 29/04/24)
· ‘Oak’ Plans and Elevations, drawing ref. PH531.1/3.2 A (received 29/04/24)
· ‘Bramber’ Plans and Elevations, drawing ref. PH441. 1/3 A (received 06/03/24)
· ‘Lester’ Plans and Elevations, drawing ref. PH334.1 (received 02/11/23)
· ‘Chestnut’ Plans and Elevations, drawing ref. PH337.1 (received 02/11/23)
· ‘Larch’ Plans and Elevations, drawing ref. PH430.1/3 (received 02/11/23)
· ‘Larch’ Plans and Elevations, drawing ref. PH430.1/3.1 (received 02/11/23)
· ‘Pine’ Plans and Elevations, drawing ref. PH436.1/3 (received 02/11/23)
· ‘Pine’ Plans and Elevations, drawing ref. PH436.1/3.1 (received 02/11/23)
· ‘Ravensworth’ Plans and Elevations, drawing ref. PH438.1 (received 02/11/23)
· ‘Dalton’ Plans and Elevations, drawing ref. PH440.1/3 (received (02/11/23)
· ‘Dalton’ Plans and Elevations, drawing ref. PH440.1/3.1 (received (02/11/23)
· ‘Dalton’ Plans and Elevations, drawing ref. PH440.1/3.2 (received (02/11/23)
· ‘Cedar’ Plans and Elevations, drawing ref. PH442.1/3 (received 02/11/23)
· ‘Harewood’ Plans and Elevations, drawing ref. PH532.1/3 (received 02/11/23)
· ‘Aspen’ Plans and Elevations, drawing ref. PH533.1/3 (received 02/11/23)
· Floor Plans, drawing ref. SH133.1/3 A (received 06/03/24)
· Elevations, drawing ref. SH133.1/3.1 A (received 06/03/24)
· Elevation and Floor Plans, drawing ref. SH202.1/3 A (received 06/03/24)
· Elevation and Floor Plans, drawing ref. SH320.1/3 A (received 06/03/24)
· Elevation and Floor Plans, drawing ref. SH321.1/3 (received 02/11/23)
· Elevation and Floor Plans, drawing ref. SH430.1 A (received 06/03/24)
· Affordable Plots Block Elevations, drawing ref. FRM-001-23 A (received 06/03/24)
Unless otherwise required by another condition of this permission.
Reason: To define the permission and for the avoidance of doubt.
Before the Development is Occupied
2 Before any part of the development hereby permitted is occupied/brought into use, the works to provide the boundary treatments shall have been completed in accordance with the approved boundary treatment scheme.
Reason: To provide a satisfactory appearance to any boundary treatments and by screening rear gardens from public view, in the interests of the privacy and amenity of the occupants of the proposed and neighbouring dwellings and in accordance with Policy DE1 of the adopted South Kesteven Local Plan.
3 Before the end of the first planting/seeding season following the occupation/first use of any part of the development hereby permitted, all soft landscape works shall have been carried out in accordance with the approved soft landscaping details.
Reason: Soft landscaping and tree planting make an important contribution to the development and its assimilation with its surroundings and in accordance with Policies DE1, EN3 and OS1 of the adopted South Kesteven Local Plan.
4 4 No development above damp proof course shall take place until further details of measures to minimise the risk of conflicts between users of the pedestrian / cycle access onto High Street, and the retained rights of access to Home Farm, have been submitted to and approved in writing by the Local Planning Authority.
Thereafter, the development shall be carried out in accordance with the approved details prior to occupation.
Reason: In the interests of highways and pedestrian safety, and to ensure that the existing public rights of way are appropriately incorporated into the development
Ongoing Conditions
5 Within a period of five years from the first occupation of the final dwelling/unit of the development hereby permitted, any trees or plants provided as part of the approved soft landscaping scheme, that die or become, in the opinion of the Local Planning Authority, seriously damaged or defective, shall be replaced in the first planting season following any such loss with a specimen of the same size and species as was approved in condition above unless otherwise agreed by the Local Planning Authority.
Reason: To ensure the provision, establishment and maintenance of a reasonable standard of landscape in accordance with the approved designs and in accordance with Policies DE1, EN3 and OS1 of the adopted South Kesteven Local Plan.
Supporting documents: